Scenic train
Arosa Line (Chur-Arosa)
Langwieser Viaduct, Gruendjitobel Viaduct, Castielertobel Viaduct; 41 bridges, 19 tunnels (longest: 399 m Lueener Ruefe tunnel), 12 avalanche galleries; climbs 1155 m over the line
- Operator
- Rhaetian Railway (RhB)
- Route
- Chur → Arosa
- Via
- Lueen-Castiel, St. Peter-Molinis, Peist, Langwies, Litzirueti
- Duration
- 1.05 h
- Length
- 25 km
- Gauge
- 1000 mm metre gauge
Source: en.wikipedia.org
Photographs
5 pictures · tap to enlargeAndres Passwirth, W. Bulach, JoachimKohler-HB, Gina Turi · Wikimedia Commons + Pexels · CC BY-SA 3.0 / CC BY-SA 4.0
Ask me
Ask me about Arosa Line
I can tell you which weeks suit it, which base to stay in and how it fits into a route with the rest of your journey. Tell me when you are coming, and I will build the days around it.
MarieLucerne and the Engadin.
Nearby
Put Arosa Line in a journey.
Tell me when you are coming and I will build the days around it — the right base, the right train, the right table — and say plainly if another season would serve it better.
- Reply within one working day
- Marie, Lucerne and the Engadin
- First outline free, fees stated
- DE · FR · EN




